Scheduled Power Interruption sa ilang bahagi ng Zambales sa darating na Martes, Oktubre 28, 2025
Time:
6:30AM to 6:30PM – ZAMECO I (Iba, Salaza, Candelaria and Sta. Cruz)
Reason:
Conducting substation equipment general maintenance, including transmission line maintenance along Botolan-Candelaria 69kV line.
Specific areas are determined by the electric cooperatives. NGCP will exert all efforts to restore power earlier or as scheduled.
via NGCP
Oct 24, 2025




